Can I Live at Home During My Extension?

You can often stay at home while an extension is built, provided you have safe access, essential facilities and living space separated from the construction work. Whether that is practical depends on your home’s layout and how much work is needed inside the existing house.

For many homeowners, the biggest disruption comes when the new extension is connected to the house, particularly if the work involves removing a kitchen or opening up an external wall.

If you are comparing a SIPs extension with traditional brick-and-block construction, ask each builder how the work will affect your household at each stage—not just how quickly the walls can go up.

What would make staying at home practical?

Start with the rooms and facilities you will still be able to use.

A rear extension built largely outside the existing house may allow normal life to continue for much of the project. An extension involving major changes to your kitchen, bathroom or main access route will need more preparation.

Before deciding to stay, ask:

  • Will we have a working toilet and somewhere to wash?

  • Will we have a usable kitchen or somewhere suitable to prepare meals?

  • Can we enter and leave the house safely?

  • Which rooms will remain available to us?

  • How will the work area be separated from children and pets?

  • Will builders or deliveries need to pass through the house?

  • When will water, electricity or heating need to be disconnected?

You do not need to solve these questions yourself. Your builder should explain the proposed arrangements before work begins.

Does a SIPs extension mean less disruption?

SIPs are structural insulated panels prepared offsite and assembled at your property. This can shorten the time spent constructing the insulated structure onsite. Traditional brick-and-block walls are generally built progressively on the site.

That can make SIPs worth considering if you want to reduce the onsite construction period. However, both methods still involve foundations, roofing, glazing, service connections and finishing.

The condition of your existing house matters too. Removing a wall, installing structural supports or replacing a kitchen can cause disruption whichever construction method you choose.

Ask about the complete project programme and the period when your existing rooms will be affected. These are more useful measures than the time needed to assemble the structure alone.

Can the extension be built before the house is opened up?

Sometimes. Depending on the design, it may be possible to construct and enclose much of the extension before opening the existing wall.

This can help keep your living space protected for longer. However, it is not possible on every project. The structural design, access and sequence of work will determine the approach.

Ask your builder:

  • At what point will the opening into the house be made?

  • How will the opening be protected before the new space is fully enclosed?

  • Will temporary partitions be needed?

  • How long will the adjoining room be affected?

  • What repairs and finishing will be needed inside the existing house?

Agree these arrangements before the work starts, particularly if the room beside the extension is your main family living space.

What happens if we are extending the kitchen?

A kitchen extension needs a plan for the period between removing the old kitchen and having the new one ready to use.

Find out when the sink, cooker, washing machine and other appliances will become unavailable. Ask whether a temporary arrangement is practical and what facilities it would provide.

You may need to plan for simpler meals, laundry elsewhere or a short stay away from home. Do not assume that a kettle and microwave will be enough for your household for several weeks.

Kitchen delivery and installation dates also matter. The main building work may finish before the kitchen, flooring or decorating is complete, particularly where different suppliers are involved.

How will dust, noise and security be managed?

Some noise and dust are unavoidable, but your builder should explain how they will be controlled.

Discuss temporary barriers, protection for existing rooms, working hours and daily clean-up arrangements. Cutting and drilling should use appropriate dust-control measures; covering furniture alone does not control dust at its source.

Also agree:

  • How the house will be secured at the end of each day.

  • Where materials and tools will be stored.

  • How deliveries and waste removal will be managed.

  • Which areas children and pets must stay out of.

  • How you will be told about particularly noisy or disruptive work.

If someone works from home, explain this early. A house can remain habitable while still being unsuitable for meetings or concentrated work during certain stages.

When might it be better to stay elsewhere?

Temporary accommodation may be sensible if your only bathroom is unavailable, the house cannot be safely separated from the work or substantial alterations affect several rooms.

It may also make the project easier for households with young children, mobility needs or health conditions that make noise, dust or restricted access particularly difficult.

You may only need to leave for a specific stage. Ask your builder to identify that period and explain how much notice you will receive if the dates change.

Before construction begins, tell your home insurer about the proposed work and check your cover, including any conditions that apply if you move out temporarily.

What should we agree before work starts?

Ask for a clear explanation of:

  1. The programme: the main stages and when existing rooms will be affected.

  2. Essential facilities: arrangements for cooking, washing, heating and utilities.

  3. Access and separation: how your household will stay safely apart from the work.

  4. Communication: your main contact and how changes will be explained.

  5. Completion: what will be ready to use when the quoted building work finishes.

Keeping these arrangements in writing helps everyone understand what to expect.

Planning an extension in Newport or Cardiff?

At Morgan Garden Studios, we discuss how the build will fit around your home and household as part of planning your extension.

Our team includes construction, electrics, plumbing and plastering, giving you one point of contact for the work included in your quotation.

Tell us about your working arrangements, children, pets and any concerns about staying at home. These practical details help us explain the programme for your particular project.

Explore our home extensions in Newport and Cardiff, book a free consultation, or call 01633 631230.

Bryce Morgan

Bryce Morgan is the youngest member of the Morgan family. Director at Green Grants Wales, he is also a partner and Head of Extensions at Morgan Garden Studios.

Previous
Previous

What if a Drain Runs Where I Want My Extension?

Next
Next

Can I Add a Modern Extension to a Traditional Home?